Ge RR3, RR7 GE REPLACEMENT -50yr. Old Relay panel see all pics & Read descrip

Ge RR3, RR7 GE REPLACEMENT -50yr. Old Relay panel see all pics & Read descrip

Ge RR3, RR7 GE REPLACEMENT -50yr. Old Relay panel see all pics & Read descrip

Ge RR3, RR7 GE REPLACEMENT -50yr. Old Relay panel see all pics & Read descrip

Ge RR3, RR7 GE REPLACEMENT -50yr. Old Relay panel see all pics & Read descrip

Ge RR3, RR7 GE REPLACEMENT -50yr. Old Relay panel see all pics & Read descrip

Ge RR3, RR7 GE REPLACEMENT -50yr. Old Relay panel see all pics & Read descrip

THE ORIGINAL GE SYSTEMS INSTALLED IN THE 1950′S TO 1970′S IN MANY CASES USED A 12” X 12” OR 12”X8” SURFACE OR FLUSH GE MANUFACTURED ENCLOSURE TO MOUNT THE RELAYS. THE PROBLEM WAS THE LACK OF SPACE IN THESE CANS. THE MAINTENANCE REQUIRED TO REPLACE FAILED RELAYS IS DIFFICULT, TIME CONSUMING, COSTLY AND THE PANEL WAS USUALLY LEFT IN MUCH WORSE SHAPE(IF YOU LOOK CLOSE THE 2 PICTURES I HAVE INCLUDE ARE OF THE SAME PANEL THE NICER ON ORIGINAL AND THE OTHER IS AFTER A CHANGEOUT OF THE INTERIOR) THAN WHEN FOUND. MANY EXISTING PANELS EXIST WITH THE COVER NOT IN PLACE ON THE CAN WHICH IS A CODE VIOLATION AND FIRE HAZARD. THIS REPLACEMENT PANEL IS BUILT SPECIFICALLY TO REPLACE THE 50 PLUS YEAR OLD PANEL INTERIORS. THE ADVANTAGES OF THIS UNIT IS AS FOLLOWS. FIELD INSTALLATION TIME IS KEPT TO A MININUM. A FAILED RELAY CAN BE REPLACED WITH A NEW RELAY IN 5 MINUTES OR LESS. NEW GRUNER RELAYS ARE THE CHOICE OF MANY OF TODAYS CURRENT PANEL MANUFACTURERS. THE GRUNER RELAYS HAVE A GREEN HANDLE TO MECHANICALLY OVERIDE THE POSITION OF THE RELAY. OLD PANELS AS SEEN IN THE PICTURES WILL AFFECT RESALE VALUE OF YOU HOME. This item is in the category “Business & Industrial\Facility Maintenance & Safety\Facility Lighting\Other Lights & Lighting”. The seller is “sparks41″ and is located in this country: US. This item can be shipped to United States.
  • Brand: GE
  • MPN: Rr7
  • Country/Region of Manufacture: United States

Comments are closed.